Wall Mounting Installation

The wall must be prepared, mounting holes drilled, and anchors installed before installing the kiosk. It is the responsibility of the owning institution to provide the nuts and anchors for the kiosk.

Specifications for the wall and bolts are detailed in the NCR SelfServ™ XK32 (2247) Site Preparation (BCC5-0000-5377) publication.

Installation of the Wall Mount Configuration varies depending on the type of wall the kiosk will be mounted on. Refer to the following sections as appropriate for the installation site:

Concrete Wall Installation

Dry Wall with Metal C-Stud Frame Installation